E-470 Widening – Parker Road to I-70 Interchange

DETAILS

Categories

Location

Services Provided

Construction Materials Testing, Geotechnical Engineering and Pavement Design

DESCRIPTION

  • Phase 1 construction for the widening of E-470 mainline from the bridge structures over Cherry Creek to Quincy Avenue is approximately 8 miles in length.
  • Phase 1 widening was completed in January of 2018.
  • The roadway embankment template was widened to the ultimate configuration with the 3rd and future 4th lane added and paved in each direction
  • Nine bridge structures were widened to the ultimate configuration, 4 lanes in each direction.
  • Phase 2 is currently being constructed with completion anticipated by April of 2021.
  • Phase 2 includes approximately 8 additional miles of alignment from Quincy Avenue through the I-70 interchange terminating on the north side of Smith Road.
  • This phase of the project includes the widening of 14 bridge structures and the extension of 2 major box culverts.

Additional PROJECTS

Wind Crest Retirement Community Construction Materials Testing

Wind Crest Retirement Community

Commerce City

Dick’s Sporting Goods Park

Interpark Distribution Center Broomfield

Interpark Distribution Center

Tri Lakes Construction Materials Testing

Tri-Lakes Medical Pavilion

Castle Rock

Cobblestone Ranch Park

Construction Materials Testing

Coors Field