An Employee Owned Company

Denargo Market Redevelopment

DETAILS

Categories

Location

Services Provided

Construction Materials Testing, Environmental Services, Geotechnical Engineering

DESCRIPTION

  • The Denargo Market project site is located two blocks from Coors Field and was featured in Colorado Construction & Design Magazine, Spring/Summer 2012 Edition.
  • This first of two development phases included a 5-story multi-family development with 301-units, and a 50,000 sq. ft. parking garage. The second development included the 390,000 sq. ft. residential complex.
  • Environmental services were provided consisting of Regulated Building Material Surveys on the existing structures that occurred at the site to determine the need for regulated disposal of Asbestos Containing Materials (ACM), PCB’s, Mercury or other electronic waste that occurred in the buildings.

Additional PROJECTS