  • In 1992, K+A joined the team of ATEC/Kumar to provide quality control and soils and materials testing at Coors Field.  The project included:
    • Placing 63,000 cubic yards of concrete,
    • Performing 2,300 temperature, slump, air, and unit weight tests,
    • Testing 9,200 concrete specimens,
    • Excavating 181,000 cubic yards,
    • Testing 86,000 cubic yards of fill for classification, moisture, and density, and backfilling.
  • K+A also performed a dewatering study for a 70-foot by 82-foot storm water vault that collects and stores between 95 and 190 gpm of storm water runoff from the playing field.
  • The study addressed the installation of well points and sheet piling prior to excavating approximately 30 feet, about 5 feet below the existing ground water level.

Additional PROJECTS

Colorado Springs

Sanderson Gulch Drainage Improvements

Children's Hospital Colorado Aurora

Children’s Hospital Colorado

Construction Materials Testing

Denargo Market Redevelopment

Roxborough Water Treatment Plant Douglas County

Roxborough Water Treatment Plant

Construction Materials Testing

Coors Field

Construction Materials Testing

Element 47