Children’s Hospital Colorado

DETAILS

Categories

Location

Services Provided

Construction Materials Testing, Environmental Services, Geotechnical Engineering

DESCRIPTION

  • The facility includes a 10-story hospital building with a 20- to 25-foot deep basement.
  • A 4-story office building with a basement level; adjoining 3- to 4-story buildings to house offices and specialized medical practices.
  • A 2-level, below-grade or mixed below-grade and above-grade parking structure located south of the hospital complex.
  • A 3-level, above-grade parking structure located east of the complex and extending about 1-city block in length.

Additional PROJECTS

Vestas Wind Turbine Facilities Brighton and Pueblo

Vestas Wind Turbine Facilities

Construction Materials Testing

Neon Local

Commerce City

Dick’s Sporting Goods Park

Breckenridge

Breck Skate Park

Construction Materials Testing

Village at Winter Park

Arapahoe County

E-470 Widening – Parker Road to I-70 Interchange