Roxborough Water Treatment Plant

DETAILS

Categories

Location

Services Provided

Geotechnical Engineering

DESCRIPTION

  • Replacement of the existing Roxborough Water Treatment Plant facility which consisted of three building structures: a pump station building, the water treatment plant building, and a storage building.
  • An approximate 225-foot long tunnel connects the upper level of the pump station building with the lower level of the water treatment plant building.
  • The project also included re-route of the existing Aurora raw waterline around the project facility and upsizing approximately 6,000 linear feet of a raw water transmission line which supplies the treatment plant.

Additional PROJECTS

Construction Materials Testing

Platte Park by Windsor

Breckenridge

Breck Skate Park

Construction Materials Testing

Coors Field

Roxborough Water Treatment Plant Douglas County

Roxborough Water Treatment Plant

Colorado Springs

William J. Hybl Sports Medicine and Performance Center

Construction Materials Testing

Paco Sanchez Park Improvements