Roxborough Water Treatment Plant

DETAILS

Categories

Location

Services Provided

Geotechnical Engineering

DESCRIPTION

  • Replacement of the existing Roxborough Water Treatment Plant facility which consisted of three building structures: a pump station building, the water treatment plant building, and a storage building.
  • An approximate 225-foot long tunnel connects the upper level of the pump station building with the lower level of the water treatment plant building.
  • The project also included re-route of the existing Aurora raw waterline around the project facility and upsizing approximately 6,000 linear feet of a raw water transmission line which supplies the treatment plant.

Additional PROJECTS

Aurora

Stanley Marketplace

Construction Materials Testing

Village at Winter Park

Construction Materials Testing

Denver Justice Center

Wind Crest Retirement Community Construction Materials Testing

Wind Crest Retirement Community

Tri Lakes Construction Materials Testing

Tri-Lakes Medical Pavilion

Broomfield

North Metro Fire Rescue District – Administration Building