Construction Materials Testing, Geotechnical Engineering

DESCRIPTION

  • The overall project included the construction of a Criminal Court Facility, a Detention Center, and a Parking Structure incorporating the replacement of the existing U.S. Postal Service building.
  • The Post/Office/Parking Structure is a pre-cast and cast-in-place concrete structure.
  • The Criminal Court and Detention Center consists of reinforced post-tensioned concrete.
  • The Criminal Court Facility consists of a 6-story structure with full-depth basement and an underground tunnel connect the Courthouse and Detention Center.