Roxborough Water Treatment Plant

DETAILS

Categories

Location

Services Provided

Geotechnical Engineering

DESCRIPTION

  • Replacement of the existing Roxborough Water Treatment Plant facility which consisted of three building structures: a pump station building, the water treatment plant building, and a storage building.
  • An approximate 225-foot long tunnel connects the upper level of the pump station building with the lower level of the water treatment plant building.
  • The project also included re-route of the existing Aurora raw waterline around the project facility and upsizing approximately 6,000 linear feet of a raw water transmission line which supplies the treatment plant.

Additional PROJECTS

Commercial/Industrial

Element by Westin

Construction Materials Testing

Neon Local

Interpark Distribution Center Broomfield

Interpark Distribution Center

Construction Materials Testing

Levitt Pavilion

Colorado Springs

William J. Hybl Sports Medicine and Performance Center

Children's Hospital Colorado Aurora

Children’s Hospital Colorado