DESCRIPTION

  • Replacement of the existing Roxborough Water Treatment Plant facility which consisted of three building structures: a pump station building, the water treatment plant building, and a storage building.
  • An approximate 225-foot long tunnel connects the upper level of the pump station building with the lower level of the water treatment plant building.
  • The project also included re-route of the existing Aurora raw waterline around the project facility and upsizing approximately 6,000 linear feet of a raw water transmission line which supplies the treatment plant.

PROJECT DETAILS

Categories:
Location: Douglas County, CO

SERVICES PROVIDED

  • Geotechnical Engineering

ADDITIONAL PROJECTS

Filter Categories
All Projects
Health Care/Senior Living
Transportation/Infrastructure
Water/Natural Resources
  • Roxborough Water Treatment Plant
    Roxborough Water Treatment Plant
    anemptytextlline
  • One Belleview Station
    One Belleview Station
    anemptytextlline
  • Colorado State University Multi-Use Stadium Kumar & Associates
    Colorado State University Multi-Use Stadium
    anemptytextlline
  • Wind Crest Retirement Community
    Wind Crest Retirement Community
    anemptytextlline
  • Mrachek Middle School Replacement
    anemptytextlline
  • Carla Madison Recreation Center
    Carla Madison Recreation Center
    anemptytextlline
  • Children's Hospital Colorado
    Children's Hospital Colorado
    anemptytextlline
  • Regional Transportation District - Oversight Verification Testing and Quality Assurance
    anemptytextlline
  • Platte Park by Windsor
    anemptytextlline
  • Chatfield Reservoir Reallocation
    Chatfield Reservoir Reallocation
    anemptytextlline