  • Replacement of the existing Roxborough Water Treatment Plant facility which consisted of three building structures: a pump station building, the water treatment plant building, and a storage building.
  • An approximate 225-foot long tunnel connects the upper level of the pump station building with the lower level of the water treatment plant building.
  • The project also included re-route of the existing Aurora raw waterline around the project facility and upsizing approximately 6,000 linear feet of a raw water transmission line which supplies the treatment plant.