DESCRIPTION

  • Project Construction included six bridges, five concrete box culverts, and 26,200 lineal feet of two and three-lane roadway.
  • Four bridges were constructed as underpasses below the northbound and southbound lanes of I-25.
  • The two remaining bridges were constructed for the east portion of the interchange associated with the ramps.
  • A total of 49 borings were drilled with 16 of the borings for the six bridge structures and the other 33 borings along the roadway/ramp alignments.
  • Subsurface materials varied across the project area and included topsoil, fill, clay, silty sand, clayey sand, poorly to well-graded sand with silt, sandstone bedrock, and claystone bedrock at various depths within the borings.

PROJECT DETAILS

Categories:
Location: Colorado Springs, Colorado

SERVICES PROVIDED

  • Geotechnical Engineering and Pavement Design
  • Construction Materials Testing

ADDITIONAL PROJECTS

Filter Categories
All Projects
Health Care/Senior Living
Transportation/Infrastructure
Water/Natural Resources
  • Roxborough Water Treatment Plant
    Roxborough Water Treatment Plant
    anemptytextlline
  • One Belleview Station
    One Belleview Station
    anemptytextlline
  • Colorado State University Multi-Use Stadium Kumar & Associates
    Colorado State University Multi-Use Stadium
    anemptytextlline
  • Wind Crest Retirement Community
    Wind Crest Retirement Community
    anemptytextlline
  • Mrachek Middle School Replacement
    anemptytextlline
  • Carla Madison Recreation Center
    Carla Madison Recreation Center
    anemptytextlline
  • Children's Hospital Colorado
    Children's Hospital Colorado
    anemptytextlline
  • Regional Transportation District - Oversight Verification Testing and Quality Assurance
    anemptytextlline
  • Platte Park by Windsor
    anemptytextlline
  • Chatfield Reservoir Reallocation
    Chatfield Reservoir Reallocation
    anemptytextlline